Berlin Deck Rebuild
01/05/2024
To begin this project we removed all of the original decking, rotted railings, and deck joists. Several new pressure-treated deck joists and ledger boards were installed before adding all-new red cedar decking with camo clip hidden fasteners for a seamless end result. Two new staircases were framed and installed on both end sections of the deck with new railings. The final touch was installing a red cedar cocktail railing for the future BBQ's to come!